Or.. the second-to-last basement update. At least, I hope! The cork was installed on Friday and it's VERY pretty. I'm not sure about the wall colour (I had to choose it before the flooring arrived), but I guess I can always repaint it later.
The bathroom tile is done. There's still a grout film on the tiles that needs to be rinsed away, but it turned out pretty nice. We still need paint in that room. Everything else is ready to go.
The fireplace finally has a mantel. It's an 80-yr-old piece of cedar from an old telephone pole that was planed into shape. Cool. It's nekkid right now (no stain or varnish) because I can't decide what I want to do with it! Dan (our contractor) has saved some offcut pieces for me so I can try out some different finishes on the wood to see what effect they'll have.Monday we're supposed to get our carpet, then we need to comb over the basement identifying things we want to see fixed. Right now the list is very extensive. We'll give them a couple of days to put some finishing touches on things before we make the list.
I can't wait until I can afford to buy furniture for this room. *grin*
Thanks for reading!
C







I've been making cards and preparing for workshops, but can't share any of my projects as they're super top secret prototype cards for the upcoming Stamp-A-Stack workshop at the end of May.
These are selling for $60 and come in a natural pine stain or dark walnut stain (shown). Ink not included! (nice try...)